An architect has selected the FlexibleLOM option fur HPE XL230a compute trays, which will host an HPC application.
When should the architect select a FlexibleLOM adapter that supports Fibre Channel over
Ethernet (FCoE)?
Answer : A
An architect is designing a data center solution that contains an HPE BladeSystem for the virtual application, infrastructure, and VDI environment. It also contains an HPE Moonshot for the web servers.
In which parts of the HPE Transformation Area does this solution fit?
Answer : B
An architect is choosing between 1GbE and 10GbE connectivity for an object storage solution.
What is a valid reason to select 10GbE?
Answer : C
A customer is planning a multi-threaded HPC solution that would benefit from threads running in parallel.
The architect selects the HPE Apollo 6000 and needs to choose between the HPE XL230a and the XL250a compute tray.
What is one reason for choosing the XL250a tray?
Answer : B
Explanation:
The HPE ProLiant XL250a Gen9 Server delivers 2P performance for your budget with dual accelerator support, while leveraging the HPE Apollo 6000 System and its modular flexibility and rack-scale efficiency. This server features the Intel Xeon E5-2600 v3/v4 series processors and 16 DIMM slots are ready with DDR4 2133 (1024 GB maximum)/2400 (2048 GB maximum) MHz memory and HPE Smart Memory.
References:
An architect is writing a response to a Request for Proposal (RFP). The customer has requested financial information on the monetary amount by which assets are valued in business records.
Which value does the architect need to consider?
Answer : C
Explanation:
References:
A customer plans to develop scripts that use the REST API for HPE OneView. However, the customer is concerned about the complexity of the scripts.
Which tool can be used to adopt the HPE OneView REST API quicker?
Answer : B
A customer is planning to migrate from a Virtual Connect Enterprise Manager (VCEM) environment to HPE OneView.
Which topic should the architect discuss with the customer before the migration is implemented?
Answer : B
What is a basic assumption for an architect using the HPE Servers TCO calculator to justify a customer's migration away from a fully depreciated set of hardware?
Answer : C
An architect is planning an HPE Moonshot System solution to support a data analytics application. The application uses data mining.
Which type of rack configuration should the architect recommend?
Answer : A
A customer plans to purchase some c7000 blade enclosures equipped with Virtual Connect
FlexFabric modules to support its development and test team. The customer is concerned about frequent changes to the server blade connectivity. In the initial proposal, an architect included HPE OneView, and now the customer wants to learn how HPE OneView will address their concern.
Which HPE OneView functionality should the architect explain to the customer?
Answer : B
An architect is proposing a solution that has two HPE Moonshot 1500 chassis, each of which is full of m700 cartridges. The customer needs the solution to quickly deploy the OS to cartridges, back up a golden node image. and clone the image.
The customer is concerned about cost and is not interested in managing or monitoring performance of the solution,
Which solution meets these requirements?
Answer : A
Explanation:
Referencehttps://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja
&uact=8&ved=0ahUKEwjU36a30sHTAhVJShQKHSt0BhYQFggnMAA&url=http%3A%2F%
2Fwww.hpe.com%2Fsupport%2Fmoonshot_os_deployment_en&usg=AFQjCNHzc8octr9gt
YrHDWIERZNfWTSoEw&sig2=ITJAdGidDUOSlN-6u7QKeQ
An architect is planning an HPE Moonshot System to host a customer Hadoop
MapReduce2 application. The architect originally proposed the following:
The customer now needs each HPE Moonshot chassis to provide at least 1TB of memory and 40TB or local storage.
Cartridge nodes needs two 10GbE ports each.
What does the architect need to replace in the solution to meet the customer's new requirements?
Answer : D
Which factors must the architect consider to help define an appropriate HPE server solution to meet a customers needs?
Answer : B
An architect is planning an HPE Integrity Superdome X solution with the following nPartitions: nPar 1= Slots 1, 3, and 5 nPar 2 = Slots 2, 4, and 6
The Superdome X solution must connect to a Fibre Channel SAN solution, which provides boot disks for the Superdome X solution.
The architect has selected a Flexible LOM adapter for each blade.
What is a valid plan for additional adapters?
Answer : D
A customer needs high performance computing (HPC) and a small-scale solution with up to eight processors. The solution should also provide storage in a modular form factor. The customers HPC application is designed so that some nodes act as compute nodes while others act as storage nodes that serve data to the compute nodes.
Which HPE Apollo system is most appropriate for this situation?
Answer : A
Have any questions or issues ? Please dont hesitate to contact us