After the vSAN iSCSI Target service is enabled, which statement about iSCSI networks is true?
Answer : D
A solution architect has finished conducting interviews and gathering requirement for a company, and has determined that the logical requirements are:
-> Two data centers for high availability
-> Synchronous replication to meet the zero-minute PRO
-> Separating management workloads from application workloads
-> Dedicated 10Gb uplink for each low latency server
-> Single management point for the entire environment
Which two actions would meet the design requirements? (Choose two.)
Answer : BD
A customer has requested a high availability option for its data center in the event of power failure and the loss of connectivity to a virtual machine. Which two vSphere features support fault tolerance? (Choose two.)
Answer : AE
Reference -
https://docs.vmware.com/en/VMware-vSphere/6.5/com.vmware.vsphere.avail.doc/GUID-F5264795-11DA-4242-B774-8C3450997033.html
DRAG DROP -
A global financial company has requested assistance with a new cross-site failover design between two sites which will support business critical applications.
Latency between the sites is less than 5ms round-trip.
The company requires:
-> Application must be restarted quickly in the event of a total site failure
-> Allow for planned migration during maintenance
-> Applications must be kept online even when migrated due to planned maintenance
Drag each statement to its correct concept:
Select and Place:
Answer :
DRAG DROP -
A company has requested assistance with a new cross-site failover design between two sites which will support business-critical applications. Latency between the sites is less than 5ms round-trip.
The company requires:
-> Applications must be restarted quickly in the event of a total site failure
-> Allow for planned migration during maintenance
-> Applications must be kept online even when migrated due to planned maintenance
Drag each statement to its correct concept.
Select and Place:
Answer :
DRAG DROP -
A customer is currently running a vCenter Server 5.5 environment with 48 identically-configured ESXi hosts.
-> These ESXi hosts are divided into six 8-host HA/DRS clusters.
-> The customer wants to upgrade to vSphere 6.5 and combine all of its ESXi hosts into a single 48-host HA/DRS cluster.
Place these actions in the correct order to accomplish this.
Select and Place:
Answer :
A company is implementing a new ESXi host cluster at its New York data center.
-> The CIO has stated that the new ESXi cluster should be designed with enough failover capacity to sustain two ESXi host failures.
-> Six ESXi hosts have been approved for this workload.
-> The ESXi hosts are to be purchased from Dell with these specifications.
-> 2x10 core 2.2GHz Intel CPU
-> 128 GB of memory
-> The workload is defined as 150 employee desktop virtual machines each with 3GB RAM reserves.
All virtual machines should be protected by vSphere High Availability.
Answer : BC
DRAG DROP -
Drag each option to its appropriate concept.
Select and Place:
Answer :
A company is implementing a new cluster to support its end user desktop workloads.
-> The workload is required to support 200 virtual machines.
-> Each end-user desktop is configured with two vCPUs, 8GB or RAM, and 40GB of thick-provisioned disk space.
-> The architect has expressed concerns that virtual machine swap files will fill the 8.5TB datastore available to the cluster.
Which two strategies would address the architect"™s concern? (Choose two.)
Answer : BD
A company has developers located in Eastern Europe (EE) and a QA Department in Bermuda.
-> The company is planning to create an environment based on a blueprint of 4-8 virtual machines for each of the developers and one for every QA project.
-> The proposed configuration will allow each developer to work independently and be able to collapse and re-create the environment as needed.
-> QA Teams will be able to recreate the environment that is required for a specific application.
-> Individual virtual machines in the blueprint are being continually updated with newly available software packages.
-> The company is planning to use the vSphere Content Library to store images and synchronize them between sites.
Which four supported configurations can the company implement? (Choose four.)
Answer : ABDF
A company has requested that a new vSphere 6,5 design be created.
-> The existing environment consists of 32 vSphere 6.0 hosts attached to an iSCSI storage array.
-> The storage arrays contain external customer financial and medical records used by company"™s investment and medical services division.
The design must:
-> Protect the company"™s existing data center investment
-> Expand to a second data center site
-> Introduce process automation
-> Expand to and fail over to public cloud
Which two non-functional requirements are applicable for this design? (Choose two.)
Answer : DE
A customer is using blade servers with only one HBA.
Which two design concepts apply to this scenario? (Choose two.)
Answer : AC
DRAG DROP -
Categorize the tools as providing either Availability or Recoverability.
Select and Place:
Answer :
An architect is designing a vSphere 6.5 implementation.
-> The customer requires Cross vCenter vMotion for the newly-created data centers in New York and Houston
Each data center will use different IP networks for management and vMotion
Answer : AC
A customer is virtualizing a mission-critical Microsoft SQL database and needs a configuration that provides optimal NUMA performance.
-> There are two possible clusters that the database virtual machine could reside in Cluster A is vSphere 6.0 and Cluster B is vSphere 6.5.
-> All ESXi hosts contain dual Intel Xeon E5-2650 processors (ie:2 socket, 10 cores per socket) and 256Gb RAM with vNUMA in its default configuration.
Given this scenario, which three statements are true? (Choose three.)
Answer : CDE