Supporting Cisco Data Center System Devices (DCTECH) v1.0

Page:    1 / 10   
Exam contains 136 questions

Refer to the exhibit.


Where is the best place to find the B200 BIOS version used in a specific Cisco UCS Manager version?

  • A. A - Installed Firmware
  • B. B - Packages
  • C. C - Images
  • D. D - Capability Catalog
  • E. E - Management Extension


Answer : B

Refer to the exhibit.


Which option should you select to get the output of the show tech-support detail command for the Cisco UCS B-Series blade?

  • A. A - ucsm
  • B. B - chassis
  • C. C - fabric-extender
  • D. D - rack-server


Answer : B

Refer to the exhibit.


Where is the best place to see the power supply status of the blade server enclosure?

  • A. A - Chassis 1
  • B. B - Chassis 1 - PSUs
  • C. C - Chassis1 - Servers
  • D. D - Rack-Mounts - Servers
  • E. E - Fabric Interconnects A - PSUs


Answer : B

To do a password recovery on a Cisco NX-OS Switch, which option shows the correct syntax to display the bootflash contents at the switch(boot)#?

  • A. display bootflash:
  • B. show bootflash:
  • C. dir bootflash:
  • D. find bootflash:


Answer : C

Which Cisco NX-OS command displays kernel uptime?

  • A. show module
  • B. show version
  • C. show license
  • D. show boot
  • E. show interface


Answer : B

Which two commands display the version of Cisco NX-OS code that the device is currently running on? (Choose two.)

  • A. show version
  • B. show module
  • C. show interface
  • D. show boot
  • E. show license


Answer : AB

On the Sensors page from the CIMC view, which four tabs are displayed to view further information? (Choose four.)

  • A. Power Supply
  • B. Fan
  • C. Memory
  • D. CPU
  • E. LEDs
  • F. Temperature


Answer : ABEF

Which three options are the minimum browser requirements to log into the Cisco CIMC GUI? (Choose three.)

  • A. Java 1.6 or higher
  • B. HTTP and HTTPS enabled
  • C. Adobe Flash Player 10 or higher
  • D. Internet Explorer version 10
  • E. Firefox 26.0
  • F. Adobe Shockwave Player 11 or higher


Answer : ABC

Which tool does a network administrator not need when installing hardware?

  • A. cable tester
  • B. wrench set
  • C. cable wraps
  • D. needle-nose pliers
  • E. PCMCIA memory
  • F. soldering iron with grounded tip


Answer : F

When the Cisco UCS Manager is used to verify the B- or C-Series device, which two types of Overall Status are acceptable and do not indicate a failure?
(Choose two.)

  • A. Online
  • B. OK
  • C. Unassociated
  • D. Active


Answer : BC

What is the correct path to verify the Overall Status of Chassis 1 | Server 3?

  • A. Equipment Tab > Chassis > Chassis 1 > Servers > Server 3 Status tab
  • B. Equipment Tab > Chassis > Chassis 1 > Servers > Server 3 General tab
  • C. Equipment Tab > Chassis > Chassis 1 > Servers > Server 3 FSM tab
  • D. Servers Tab > Chassis > Server 3 General tab
  • E. Status Tab > Chassis > Chassis 1 > Servers > Server 3
  • F. Admin Tab > Chassis > Chassis 1 > Servers > Server 3 General tab


Answer : B

If the Overall Status for a Cisco UCS B-Series Blade Server indicates a failure in the Cisco UCS Manager, such as discovery-failed, which statement is true?

  • A. The server shuts down.
  • B. The server automatically reboots reboot in 3 minutes.
  • C. The endpoints on that server cannot be upgraded.
  • D. The server is online, but the administrator cannot assign a service profile to that blade.


Answer : C

Which action should the administrator take before physically removing a blade server for maintenance or replacement?

  • A. Force the server to shut down.
  • B. Disassociate the service profile.
  • C. Decommission the server.
  • D. Perform a graceful shutdown of the server.


Answer : C

Which three statements about powering down a Cisco UCS C-Series Rack-Mount Server to perform maintenance or replacement are true? (Choose three.)

  • A. Standby power mode: Power is supplied only to the service processor and the cooling fans, and it is safe to power off the server from this mode.
  • B. Power status LED. Green indicates that the server is in main power mode and can be safely powered off.
  • C. Graceful shutdown: Press and release the power button. The operating system performs a graceful shutdown, and the server goes to standby mode, which is indicated by an amber power status LED.
  • D. Disconnect the power cords from the power supplies in your server to completely power off the server.
  • E. Only an emergency shutdown can be performed using the power button on the server front panel.
  • F. The Cisco UCS C-Series Rack-Mount Server has only one power mode.


Answer : ACD

Which three components are hot swappable in a Cisco UCS Blade Server and Chassis? (Choose three.)

  • A. Fabric Extender
  • B. Power supply
  • C. Heat sink
  • D. SAS Hard Drive
  • E. 2x8GB Kit DIMMs
  • F. Mezzanine card


Answer : ABD

Page:    1 / 10   
Exam contains 136 questions

Talk to us!


Have any questions or issues ? Please dont hesitate to contact us

Certlibrary.com is owned by MBS Tech Limited: Room 1905 Nam Wo Hong Building, 148 Wing Lok Street, Sheung Wan, Hong Kong. Company registration number: 2310926
Certlibrary doesn't offer Real Microsoft Exam Questions. Certlibrary Materials do not contain actual questions and answers from Cisco's Certification Exams.
CFA Institute does not endorse, promote or warrant the accuracy or quality of Certlibrary. CFA® and Chartered Financial Analyst® are registered trademarks owned by CFA Institute.
Terms & Conditions | Privacy Policy